Fò ó lọ sí àkóónú pàtàkì
727 Finance
Yorùbá

Ethereum Glamsterdam upgrade will be activated on the Sepolia testnet on October 6

PANews reported on September 29 that the Ethereum Foundation announced that the Ethereum network upgrade Glamsterdam is scheduled to be activated on the Sepolia test network on October 6, at 21:53:36 Beijing time, corresponding to epoch 353024 and slot 11296768. The activation date for Hoodi and mainnet has not yet been determined. Glamsterdam combines the execution layer Amsterdam upgrade and the consensus layer Gloas upgrade. The core changes include embedded proposer-builder separation and block-level access lists to improve L1 throughput, and adjust gas billing to better reflect execution and state growth costs. Node operators must update the execution layer and consensus layer clients before activation. Contracts that rely on fixed gas assumptions may need to be modified.

PANews reported on September 29 that the Ethereum Foundation announced that the Ethereum network upgrade Glamsterdam is scheduled to be activated on the Sepolia test network on October 6, at 21:53:36 Beijing time, corresponding to epoch 353024 and slot 11296768. The activation date for Hoodi and mainnet has not yet been determined. Glamsterdam combines the execution layer Amsterdam upgrade and the consensus layer Gloas upgrade. The core changes include embedded proposer-builder separation and block-level access lists to improve L1 throughput, and adjust gas billing to better reflect execution and state growth costs. Node operators must update the execution layer and consensus layer clients before activation. Contracts that rely on fixed gas assumptions may need to be modified.

Ìròyìn tó ní í ṣe pẹ̀lú

  1. Lẹ́yìn tí wọ́n ti ń yára láti gbé àwọn ojútùú L2 kalẹ̀, kí ni ìdí tí wọ́n fi ń padà sí Ethereum mainnet báyìí?

    Ìmúdàgba Ethereum ń tún ẹ̀kọ́ ìpìlẹ̀ kọ, àti ìtàn Rollup tí ó gbóná tẹ́lẹ̀ ń dojú kọ àtúnyẹ̀wò.

  2. Ìgbìmọ̀ Àárín CPC: Fìdí kalẹ̀ láti dojú kọ ìwà ìbàjẹ́ tí wọ́n ń ṣe pẹ̀lú àwọn owó virtual àti blockchain.

    PANews Ìròyìn ọjọ́ kìíní oṣù kọkànlá, ní ìbámu pẹ̀lú Ìwé Ìròyìn Xinhua, "Ìpinnu Ìgbìmọ̀ Àárín Ẹgbẹ́ Kọ́múnísítì ilẹ̀ Ṣáínà lórí Ọ̀pọ̀lọpọ̀ Àwọn Ọ̀ràn Pàtàkì Níp...

  3. Ọjọ́ ìtújáde Protocol V2 ti ṣe àtúnṣe láti November 2 sí November 9.

  4. PA Graphic | A quick look at major Web3 events in November 2026

    · PA Infographic | A quick look at major Web3 events in November 2026

  5. SOON: Due to abnormal withdrawal activity, the cross-chain bridge service between svmBNB and the mainnet has been suspended.