ወደ ዋና ይዘት ዝለል
727 Finance
አማርኛ

The Ethereum Foundation has postponed the Glamsterdam upgrade on the Hoodi testnet, with the specific date yet to be determined.

PANews October 23 news: The Ethereum Foundation has issued an announcement stating that the "Glamsterdam" upgrade, originally scheduled to take place on the Hoodi testnet on October 27 (Epoch 132,352), has been postponed to allow further study of the interaction effects between EIP-8037 and mainnet smart contracts. A new activation date has not yet been determined. This postponement cancels the originally planned "Amsterdam" execution layer activation and "Gloas" consensus layer activation. At the same time, the plan to raise Hoodi's gas limit to 200 million in the same Epoch has also been canceled. This action only withdraws the configuration for the future upgrade and will not roll back Hoodi's on-chain history.

PANews October 23 news: The Ethereum Foundation has issued an announcement stating that the "Glamsterdam" upgrade, originally scheduled to take place on the Hoodi testnet on October 27 (Epoch 132,352), has been postponed to allow further study of the interaction effects between EIP-8037 and mainnet smart contracts. A new activation date has not yet been determined. This postponement cancels the originally planned "Amsterdam" execution layer activation and "Gloas" consensus layer activation. At the same time, the plan to raise Hoodi's gas limit to 200 million in the same Epoch has also been canceled. This action only withdraws the configuration for the future upgrade and will not roll back Hoodi's on-chain history.

ተዛማጅ ዜና

  1. አንድ ወቅት L2 መፍትሄዎችን ለማሰማራት ጓጉተው የነበሩት፣ አሁን ለምን ወደ ኢትሪየም ዋና መረብ ይመለሳሉ?

    የኢቴሪየም መስፋፋት መሰረታዊውን አመክንዮ እየፃፈ ነው፣ እና በአንድ ወቅት ተወዳጅ የነበረው የRollup ትረካ አሁን እንደገና ግምገማ እያጋጠመው ነው።

  2. የሲፒሲ ማዕከላዊ ኮሚቴ፡ በቨርቹዋል ካሪንሲዎች እና በብሎክቼይን በሚፈጸም ሙስና ላይ በጽኑ ለመቅጣት።

    የPANews ህዳር 1 ዜና፣ በሺንሁዋ የዜና ኤጀንሲ መሠረት፣ በጥቅምት 29 በቻይና ኮሚኒስት ፓርቲ የ20ኛው ማዕከላዊ ኮሚቴ አምስተኛው ሙሉ ጉባኤ የተቀበለው "የቻይና ኮሚኒስት ፓርቲ ማዕከላዊ ኮሚቴ ሙሉና ጥብቅ የፓርቲ አስተዳደርን በጽናት ማራመድን በተ...

  3. የፕሮቶኮል V2 የልቀት ቀን ከኖቬምበር 2 ወደ ኖቬምበር 9 ተስተካክሏል።

  4. PA Graphic | A quick look at major Web3 events in November 2026

    · PA Infographic | A quick look at major Web3 events in November 2026

  5. SOON: Due to abnormal withdrawal activity, the cross-chain bridge service between svmBNB and the mainnet has been suspended.